Status Update!

It’s been quiet here because I’m working on so many SECRET PROJECTS.

SECRET PROJECT #1 is done and just needs photos and wrapping paper.
SECRET PROJECT #2 is in the same state.
SECRET PROJECT #3, which is huge and has been spotted in the wild at knit night, just needs to be washed and blocked.
SECRET PROJECT #4 needs washing, blocking, and seaming.

This is the problem with gift knitting – I can’t write WIP reports! But boy, will I have some things to show off soon.

In the meantime, I am also finishing the Sipalu bag – it just needs two more rows of colorwork and a top welt. Then I need to figure out how I’m going to do the strap and closure, because I don’t like the originals. HMM.

After that, a certain Meg has convinced me to knitalong an Annis shawlette. Can I get it done before vacation? LET’S FIND OUT!

Tags: , , , ,

Leave a Reply

You must be logged in to post a comment.